1, Requirement
Participant in the Renovation of In-Exterior works for PPCBank_Preah Sihanouk Province Branch
Expected Renovation Period: From 1st Jul 2025 to 31st Aug 2025 (Max 2 months)
Participant in the Renovation of In-Exterior works for PPCBank_Preah Sihanouk Province Branch
Expected Renovation Period: From 1st Jul 2025 to 31st Aug 2025 (Max 2 months)
Note
The renovation period can be extended depending on unexpected circumstance on mutual consents with PPCBank.
Reference to the layout contents with the following details
Interior works
First Floor
Deposit Counter (6 tellers, 1 chief teller)
Vault Room (at least 16 m
At least 2 Meeting rooms or more
Pantry room including sink
Toilet (WC) (proper size for the number of working staff)
Mezzanine Floor
Server room
Electrical room
Second Floor
BM office ( 1 BM)
To install smart glass in BM office (1200x2200x11mm, 3pcs, existing)
Loan office (10 loan officers, 2 chief loan officer)
At least 3 Meeting rooms or more
Pantry room including sink
Toilet (WC) (proper size for the number of working staff)
Third Floor
Reserve meeting rooms
Document Rooms
Storage rooms
Toilet (WC)
Note for interior design
All mentioned above or more, participant in the construction of in-exterior shall suggest design at your discretion and by efficiently arranging it in the layout.
The wall at ground floor, wall and veranda at mezzanine floor as attached layout shall be demolished
Counters face to the entrance door.
Build up a stair to connect each floor.
Submission 3D design at your discretion and suggestion to improve branding.
Water proof of any places inside the bank in order to protect all equipment shall be required.
Quotation including M&E (Reference to specification of Layout) shall be submitted.
Quotation of network and telephone shall be submitted separately by attaching company profile including specific network and telephone, vendor name and contact information.
Exterior Works
Signboard (arrangement is required considering the electric line, it does not have to be the same as the existing signboard created suggestions are required)
Exterior Coverage (it must specify the place of production of the material)
Water proof and zinc roof shall be required for any places to protect leaking from raining, in terms of roof with proper water way.
Note for exterior design
All mentioned above or more, participant in the construction of exterior shall suggest design at your discretion and by efficiently design.
Submission 3D design at your discretion based on any suggestion to improve branding image.
Monday, 16th Jun 2025 (11:00 AM)
Application documents shall be submitted to Administrative Department of PPCBank
PPCBank HQ Building Address: Nº 217, Norodom Blvd., Phum 10, Sangkat Tonle Bassac, Khan Chamkarmorn, Phnom Penh, Cambodia
Application documents shall be enclosed with the company seal.
Company introduction including such as company name, establishment year, capital, total assets, previous year’s net profit, number of employees, major business field, representative nationality
Company related to the construction of interior and exterior that registered business in Cambodia
Decision is according to the bank’s internal regulations.
None
PPCBank will notify on proper date before construction.
Within 10 days from the date of notification of the result
Identify guidelines, regulations, special conditions, etc. of local authority in relation to facility construction
Inspection procedure will be carried out after completion of construction
If you have any concern, please feel free to contact us.