The construction of Interior and Exterior Works for Training Center of PPCBank

Published Date: June 23, 2026

1, Requirement

Participant in the construction of Interior and Exterior works for Training Center

Expected Construction Period: From 17th Jul 2026 to 16th Sep 2026 (Max 2 months)


Note

The renovation period can be extended depending on unexpected circumstance on mutual consents with PPCBank.

2, Field descriptions

Reference to the layout contents with the following details

  • Interior works

    • Ground Floor

      1. Open the space for parking

      2. Toilets

      3. Stair access to upstairs

      4. Small Storage

    • First Floor

      1. Big pantry room including sink

      2. Hall for take a rest

      3. Server room

      4. Electrical room

      5. Small Storage

    • Second Floor

      1. Office for 15 to 20 staff

      2. Internal system training room for 10 to 20 trainees

      3. Training room for 20 to 25 trainees

      4. Toilet (proper size for the number of working staff)

      5. Meeting Room (40-50 people)

    • Third floor

      1. Big training room for 100 trainees or more

      2. Small office for 2 to 4 staff

      3. Toilet (proper size for the number of trainees)

  • Note for interior design

    • For all items mentioned above and any additional works, the contractor responsible for the interior construction shall propose the design at its discretion and efficiently incorporate it into the layout.

    • All designed layout is designed by contractor as well as flexible and creative idea

    • Submission 3D design at your discretion and suggestion to improve branding.

    • Water proof of any places inside the bank in order to protect all equipment shall be required.

    • Quotation including M&E (Reference to specification of Layout) shall be submitted.

    • Quotation of network and telephone shall be submitted separately by attaching company profile including specific network and telephone, vendor name and contact information.

  • Exterior Works

    1. Exterior Coverage (it shall be a creative idea for training center of banking institution)

    2. Water proof and zinc roof shall be required for any places to protect leaking from raining, in terms of roof with proper water way.

    3. Generator room at proper place including electricity connection works.

  • Note for exterior design

    • Submission 3D design at your discretion based on any suggestion to improve branding image.

3, Submission deadline for applications

Friday, 3rd July 2026 (11:00 AM)

4, How to submit your application
  • Application documents shall be submitted to Administrative Department of PPCBank

  • PPCBank HQ Building Address: Nº 217, Norodom Blvd., Phum 10, Sangkat Tonle Bassac, Khan Chamkarmorn, Phnom Penh, Cambodia

Application documents shall be enclosed with the company seal.

5, Application Documents

Company introduction including such as company name, establishment year, capital, total assets, previous year’s net profit, number of employees, major business field, representative nationality

6, Applicant qualification

Company related to the construction of interior and exterior that registered business in Cambodia

7, Decision-making method of company

Decision is according to the bank’s internal regulations.

8, Application Deposit

None

9, Result notification date

PPCBank will notify on proper date before construction.

10, Signing of contract for construction

Within 10 days from the date of notification of the result

11, What to note when submitting your application
  • Identify guidelines, regulations, special conditions, etc. of local authority in relation to facility construction

  • Inspection procedure will be carried out after completion of construction

If you have any concern, please feel free to contact us.